The costs of highway improvement works are a combination of:
- The works costs (i.e. the cost for the contractor to construct the works)
- Supervision/Inspection costs (the Highway Engineer and/or Local Highway Authority costs)
- Supply costs (for items that have to be purchased from designated sources - such as traffic signals, bus shelters etc.)
- Utility diversion costs (these works may be carried out prior to and/or during the main construction works).
Additionally there will be costs associated with the design and procurement procedures as well as legal charges in the Section 278 Agreement with the Local Highway Authority to carry out the works. There are also potential costs for land acquisition and commuted sums to the Local Highway Authority for future maintenance of the highway works constructed.
Design costs are usually estimated from a database of rates for the Highway Engineer and technical support staff who will be carrying out the design. Estimates of costs from specialist designers who may be involved in the works, i.e. structural engineers, street lighting designers etc. must also be included.
Before an estimate of the works construction costs can be calculated, a bill of quantities will be produced that contains all the elements of work that will be required for the construction of the project. Rates are then applied from a database of similar items to produce the estimate. The database will be a combination of items from recent priced bills of quantities, and actual quotes for other items where prices are not readily available. Additionally, rates can be obtained from other sources such as Spon's “Civil Engineering and Highway Price Book” and the Civil Engineering Contractors Association’s “Schedule of Dayworks Carried Out Incidental to Contract Work”.
What Our Clients Say:
Swept Path Analysis and Visibility Drawing incorporated into a Technical Note, Proposed Residential Dwelling, Colchester.
Highway Statement, Proposed Residential Development, Stockport
Transport Assessment, Proposed Residential Development (170 dwellings), Essex
Speed Survey, Proposed Private Residential Development – Testimonial
Access Feasibility Study, Proposed Private Residential Development – Testimonial
Analysis of Speed Survey and Swept Path Analysis
Stage 2 Road Safety Audit, Residential, Staffordshire
Construction Traffic Management Plan
Flood Risk Assessment, Testimonial, Industrial Development, Sheffield
Travel Plan
Require the Services of a Highway Engineer?
Sanderson Associates have enjoyed over 36 years in business delivering experienced Highway Engineering Services to our clients, having completed over 12,200 schemes for a wide variety of major and minor developments throughout the whole of the UK, Isle of Man and Ireland.
We would be pleased to provide you with our competitive fee proposal to provide you with our Highway Engineering Services, please call us on 01924 844080 or click here to complete our secure online form.